Week of May 8th-12th
Installed french drain, backfilled sub-grade in preparation for the interior slab. Plumbing sub-rough installed. Plumbing sub-rough inspection completed.

Week of May 15th-19th
Installed rebar mat and insulated for radiant heat tube. Radiant heat tube installed and inspected. Poured basement slab.

Week of May 22nd-26th
Set steel columns and beams. Framing basement walls.

Week of May 29th-June 2nd
Set main level iron floor beams. Framing lower level. Backfilling foundation walls and hauling off excess materials.

New Sponsors on Board
-Adaptive Lighting and Controls
-Lifestyles Electronics
-The designers are currently choosing sponsors for the flooring and wooden doors as well as all cabinetry.

reviews of Construction Update for May 2006
The content of this field is kept private and will not be shown publicly.
  • No HTML tags allowed

More information about formatting options

Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.
All submitted comments are subject to the license terms set forth in our Privacy Policy and Terms of Use